Mission:North Central Gap 03 Date:April 10, 2017 Operator:BT Accumulation radar had issues for the first time in 5 weeks. DDS was modified to carry DC load condition better. DDS started first time, other than not having 10MHz clock started first. Accidently turned off the DAQ by hitting F4 on wrong window. MCORDS all is good. First two segments are calibration data segments. Final is then the survey.